A consultant successfully installs the Foundation VM on a laptop and needs to ensure the VM can communicate externally.
Which two configuration changes should the consultant make next? (Choose two.)
A consultant needs to verify the make and model of the systems that will be imaged with Foundation. The consultant does not have the Bill of Materials (BOM) available to review.
When should the consultant verify the make and model to prepare for the cluster deployment?
A consultant is running Foundation. The cluster creation fails during the process. The host logs confirm that the nodes have been successfully imaged. The consultant decides to create the cluster manually.
Which command should the consultant use?
Which two components must be identified to validate that software compatibility requirements are met for Nutanix Cluster Installation? (Choose two.)
A consultant creates a four-node AHV cluster with two 1GbE (eth0, etc1) and two 10GbE (eth2, eth3) NICs per node. The 1GbE NICs will not be placed into service, but the customer wants the network to be preconfigured for their eventual use.
The consultant removes the 1GbE NIC from the default bond and creates a second bridge(br1), but is unable to add the 1GbE NIC using the below command:
manage_ovs --bridge_name br1 --interfaces 1g --bond_name br1-up update_uplinks
Which parameter is missing from this command?