Free Huawei H12-411_V2.0 Exam Actual Questions

The questions for H12-411_V2.0 were last updated On Jan 19, 2025

Question No. 1

During the battery installation process, the maintenance channel of the high-voltage battery pack used should be insulated.

Show Answer Hide Answer
Correct Answer: A

Question No. 2

The general method of connecting lead-acid batteries is to string first and then parallel.

Show Answer Hide Answer
Correct Answer: A

Question No. 3

____________ can complete the conversion from DC to AC.

Show Answer Hide Answer
Correct Answer: A

Question No. 4

The gas fire extinguishing system consists of ____________ .

Show Answer Hide Answer
Correct Answer: A

Question No. 5

The humidifier used in Huawei's row-level precision air conditioner is an infrared humidifier.

Show Answer Hide Answer
Correct Answer: B