At ValidExamDumps, we consistently monitor updates to the HPE6-A80 exam questions by HP. Whenever our team identifies changes in the exam questions,exam objectives, exam focus areas or in exam requirements, We immediately update our exam questions for both PDF and online practice exams. This commitment ensures our customers always have access to the most current and accurate questions. By preparing with these actual questions, our customers can successfully pass the HP Aruba Certified Design Expert Written Exam exam on their first attempt without needing additional materials or study guides.
Other certification materials providers often include outdated or removed questions by HP in their HPE6-A80 exam. These outdated questions lead to customers failing their HP Aruba Certified Design Expert Written Exam exam. In contrast, we ensure our questions bank includes only precise and up-to-date questions, guaranteeing their presence in your actual exam. Our main priority is your success in the HPE6-A80 exam, not profiting from selling obsolete exam questions in PDF or Online Practice Test.
A customer has multiple, very small branch sites that require just one or two APs each. The office has a local Internet connection, but all of the traffic is destined To the corporate data center, which has an Aruba wireless solution.
Which branch office solution best meets the customer needs?
Refer to the exhibit.
A stadium wants to deploy location-based services, including blue-dot wayfinding over a 200.000 square root (isr580 sq. m) are
a. The custom past particular areas. The customer has selected a 1 year subscription.
The exhibit shows the BOM that the architect created in iris.
Which correction should the architect make?
A customer has an Aruba wireless network. which includes two MC 7205s and an MM at the network core. The company now wants to accommodate 50 mobile trainers These trainers travel around the world and run training events. The trainers often need to access materials in the company data center, but cannot reach materials when they are on the road.
The company wants to give the mobile workforce a secure way to reach the materials they need no matter where they are.
including in public spaces like the hotels where they often leach. The customer also requires that the solution be as cost
effective as possible while meeting the requirements.
Which plan meets the needs of the mobile Trainers?
Refer to the exhibit.
A customer requires a core switching solution for a very large multi-building campus with about 30;ooo wireless clients and devices. The network will have a flat topology as shown in the exhibit, and MCs will forward all wireless traffic to the core for routing.
The customer had considered Aruba 5400R Series switches, but the architect recommends Aruba S320 switches Instead.
How should the architect justify this recommendation?
Refer to the exhibit.
A customer needs a wired upgrade for a building on its main campus. The exhibit shows the switches that the architect has selected for each closet and me existing cabling. The customer is not open to changing the cabling.
The customer requires link redundancy for the uplinks from each closet and for the links from the building to the core. In non link failure situations, the uplinks from each closet must support at least 20Gbps, and the building as a whole must have at least 20 Gbps to the core in non link failure situations
Which two options Tor connecting the closets to the network core are valid? (select two.)