Free Dell EMC D-ISM-FN-23 Exam Actual Questions

The questions for D-ISM-FN-23 were last updated On Jan 19, 2025

Question No. 1

Refer to the Exhibit:

What type of FC port connects each FCIP gateway to each FC SAN?

Show Answer Hide Answer
Correct Answer: C

Question No. 2

A Fibre Channel switch has eight ports and all ports must be operational 24 hours 7 days. However, a failure of Port 5 occurs on a particular week as follows:

Monday = 11 AM to 3 PM -

Thursday = 6 AM to 11 AM -

Saturday = 11 AM to 4 PM -

What is the availability of Port 5 in that week?

Show Answer Hide Answer
Correct Answer: A

Question No. 3

A Fibre Channel switch has eight ports and all ports must be operational from 6 AM to 6 PM, Monday through Friday.

However, a failure of Port 4 occurs with the week as follows:

Monday= 11 AM to 1 PM

Wednesday= 5 PM to 10 PM

Thursday= 7 AM to 10 AM

Saturday= 11 AM to 1 PM

What is the availability of Port 4 in that week?

Show Answer Hide Answer
Correct Answer: B

To calculate availability, you need to calculate the total number of hours that the port is operational and divide it by the total number of hours in the week, which is 168. The total number of hours that Port 4 is operational in that week is 106.7, so the availability is 106.7/168 = 86.7%.


Question No. 4

What is a benefit of using a Scale-Out NAS system vs. general purpose file servers?

Show Answer Hide Answer
Correct Answer: B

Question No. 5

An Ethernet switch has eight ports and all ports must be operational for 24 hours from Monday through Friday.

However, a failure of Port 7 occurs as follows:

Monday=4 PM to 11 PM

Wednesday= 2 PM to 10 PM

Friday= 5 AM to11 AM

What is the MTTR of Port 7?

Show Answer Hide Answer
Correct Answer: C

To calculate MTTR, we need to convert the hours into minutes. Here are the steps:

Monday: Port 7 was down from 4 PM to 11 PM. That's 7 hours or 420 minutes.

Wednesday: Port 7 was down from 2 PM to 10 PM. That's 8 hours or 480 minutes.

Friday: Port 7 was down from 5 AM to11 AM. That's 6 hours or 360 minutes.

Total corrective maintenance time = 420 + 480 + 360 =1260 minutes

Number of repairs =3

MTTR = Total corrective maintenance time / Number of repairs

MTTR =1260 / 3 =420 minutes

Therefore, the MTTR of Port 7 is420 minutes.