Free Cisco 300-620 Exam Actual Questions

The questions for 300-620 were last updated On Nov 16, 2024

Question No. 1

An engineer must ensure that Cisco ACI flushes the appropriate endpoints when a topology change notification message is received in an MST domain. Which three steps are required to accomplish this goal? (Choose three.)

Show Answer Hide Answer
Correct Answer: A, B, D

Question No. 2

Which two actions extend a Layer 2 domain beyond the ACI fabric? (Choose two.)

Show Answer Hide Answer
Correct Answer: D, E

Question No. 3

Where is the COOP database located?

Show Answer Hide Answer
Correct Answer: B

Question No. 4

Refer to the exhibit.

Refer to the exhibit. An administrator configures inter-VRF route leaking between Production:vrf-prod and Non-Production:vrf-nonprod. However, the route in the Non-Production:vrf-nonprod VRF to the production tenant is missing. Which action resolves the VRF route leaking issue?

Show Answer Hide Answer
Correct Answer: B

Question No. 5

Which two dynamic routing protocols are supported when using Cisco ACI to connect to an external Layer 3 network? (Choose two.)

Show Answer Hide Answer
Correct Answer: A, E